1. 凯发国际·(中国区)官方直营平台

    Stock code:002266
    0571-89939661
    CN EN
    Subsidiary
    Shenlian Group Zhefu Hydropower Zhefu Nuclear Huadu Nuclear
    Zhefu History
    2022 - 2018
    2015-2011
    Established
    2021

    Our revenue hit a record high of RMB10 billion

    Zhefu Nuclear Power Equipment Co., Ltd. was established

    2020

    The company completed restructuring of assets worth RMB14.5 billion and official expanded its business into pollution-free disposal of hazardous waste and recycling of secondary metals

    Sichuan Huadu Nuclear Equipment Manufacturing Co., Ltd. was listed in the second batch of small specialized and sophisticated companies that produce new and unique products in China

    2019

    We started acquiring full equities of Shenlian Group and 40% equities of Shenneng Environmental Protection

    In November, the main prototype pump of the world’s largest and China's first 600MW fourth-generation commercial liquid metals cooled fast reactor developed by Zhefu Group successfully went through a trial run. Its performance indicators were better than expected, and the life test was completed. It marks a breakthrough in the development of core components of fourth-generation nuclear power commercial fast reactors in China.

    2013

    We formulated the "energy + strategic investment" strategic plan.

    The design of cylindrical valves for large hydro-generator sets was approved in the national appraisal

    The hydraulic mechanical test bench (hydraulic mechanical laboratory) received final acceptance and became world-leading

     

    2012

    We signed a framework agreement with China National Nuclear Corporation on strengthening cooperation in nuclear power and some other fields

    The Zhefu Physical and Chemical Testing Center was officially established

    Our FCJ hydro generator set was recognized as a famous brand of Zhejiang Province.

     

    2011

    The Insulation Testing Center was the first institution in China’s hydropower equipment industry to receive a certificate from the China National Accreditation Service for Conformity Assessment (CNAS)

    2009

    The company was rated as a provincial R & D center of the high-tech company

    2008

    The company was listed on the Shenzhen Stock Exchange

    The CFD digital simulation laboratory and the CAEC were established

    A provincial postdoctoral center (pilot) was approved to be established.

    The R & D Center for the Fuchunjiang Hydro Generator Set was selected as the Provincial R & D Center of the high-tech Company

    2007

    The Insulation R & D Center was established

    2004

    The Hangzhou R & D Center was established

    Zhejiang Fuchunjiang Hydropower Equipment Co., Ltd. was established

    2021

    Our revenue hit a record high of RMB10 billion

    Zhefu Nuclear Power Equipment Co., Ltd. was established

    2020

    The company completed restructuring of assets worth RMB14.5 billion and official expanded its business into pollution-free disposal of hazardous waste and recycling of secondary metals

    Sichuan Huadu Nuclear Equipment Manufacturing Co., Ltd. was listed in the second batch of small specialized and sophisticated companies that produce new and unique products in China

    2019

    We started acquiring full equities of Shenlian Group and 40% equities of Shenneng Environmental Protection

    In November, the main prototype pump of the world’s largest and China's first 600MW fourth-generation commercial liquid metals cooled fast reactor developed by Zhefu Group successfully went through a trial run. Its performance indicators were better than expected, and the life test was completed. It marks a breakthrough in the development of core components of fourth-generation nuclear power commercial fast reactors in China.

    2013

    We formulated the "energy + strategic investment" strategic plan.

    The design of cylindrical valves for large hydro-generator sets was approved in the national appraisal

    The hydraulic mechanical test bench (hydraulic mechanical laboratory) received final acceptance and became world-leading

     

    2012

    We signed a framework agreement with China National Nuclear Corporation on strengthening cooperation in nuclear power and some other fields

    The Zhefu Physical and Chemical Testing Center was officially established

    Our FCJ hydro generator set was recognized as a famous brand of Zhejiang Province.

     

    2011

    The Insulation Testing Center was the first institution in China’s hydropower equipment industry to receive a certificate from the China National Accreditation Service for Conformity Assessment (CNAS)

    2009

    The company was rated as a provincial R & D center of the high-tech company

    2008

    The company was listed on the Shenzhen Stock Exchange

    The CFD digital simulation laboratory and the CAEC were established

    A provincial postdoctoral center (pilot) was approved to be established.

    The R & D Center for the Fuchunjiang Hydro Generator Set was selected as the Provincial R & D Center of the high-tech Company

    2007

    The Insulation R & D Center was established

    2004

    The Hangzhou R & D Center was established

    Zhejiang Fuchunjiang Hydropower Equipment Co., Ltd. was established